Photos: What the RDA destroyed at Morlands
Simon Fairlie
chapter7 at tlio.org.uk
Tue Jan 6 22:40:19 GMT 2009
Here are some photos showing what the SW RDA has destroyed at
Morlands Glastonbury, and two of the local projects which it refused
to even negotiate about.
1 The Bauhaus building, now demolished by the RDA.
2 The Hepworth building, the first vaulted north light building in
the UK, demolished by the RDA .
3. Full Circle proposal for Morlands. 2000
4. Picture of the Somerset Trust for Sustainable Development
proposal, reproduced in Chapter 7 News. 2001
5. Red brick building, scheduled for demolition, currently occupied
by protesters.
These plus many other photos, including all the existing buildings,
are available in print resolution from chapter7 at tlio.org.uk 01460
249204


Chapter 7
The Potato Store, Flaxdrayton, South Petherton, Somerset, TA13 5LR
01460 249204 chapter7 at tlio.org.uk
FACTSHEET ON MORLANDS
Fifteen protesters have occupied the “Red Brick” buildings at the
Southern End of the Morlands site between Glastonbury and Street in
Somerset. The occupied buildings are scheduled for demolition by the
South West Regional Development Agency, commencing today, 5 January
2009.
BRIEF HISTORY: THE £20 MILLION TRAFFIC LIGHTS
Formerly the site of the Morlands leather works, this is the largest
derelict industrial site in the South West and most of it has
remained empty for over 20 years. It was privately owned until 2001,
by a consortium who hoped to put a large retail development on the
site, but this was resisted by Glastonbury Town and Mendip District
Council who wanted to keep it for employment.
In 2001, The Land Is Ours and some local people planned an occupation
of the site, but called it off at the last moment when the SW
Regional Development Agency suddenly bought the site, claiming it was
going to redevelop it “sustainably”.
In the intervening 8 years, the RDA has done nothing to the site
except demolish over half the buildings, even though most of these
were assessed as beng sound by a surveyor’s report (see below). It
has left a whole row of terraced houses derelict. It has also built a
set of traffic lights, known locally as the £20million traffic lights.
DUPLICITY
All of these demolitions occurred at short notice after repeated
assurances to concerned members of the public that the buildings
would not be demolished.
A week before Christmas 2009, the RDA announced that they would be
demolishing the Red Brick buildings on the 5 January, on the pretext
that kids are getting in and might hurt themselves! But you don't
demolish tens of thousands of square feet of well built workshops
that would cost many millions of pounds to build again, just to save
the wages of a night watchman.
This has been typical of the SW RDA’s approach all along. We hear
similar reports from other regions and in 2008 a Radio 4 documentary
produced examples of this kind of behaviour from RDAs around the
country.
REFUSAL TO CONSIDER LOCAL PROPOSALS
Prior to demolition, the RDA has refused to consider at least three
major local proposals for sustainable redevelopment of the existing
buildings. One of these was a joint venture between Bristol
University Technology Hub and The Somerset Trust for Sustainable
Devlopment (now ECOS), who built the award-winning Bow Yard ecohomes
at Langport.
All representations from the organizations promoting these three
projects were ignored by the RDA, who mostly simply refused to reply.
The RDA has also refused to consider any request from individuals and
small businesses to rent any of the premises. Local groups have
petitioned the RDA to rent out some of the buildings on a cheap and
cheerful repair lease, at least on a short term basis. Next to
Morlands there is a small employment site for small businesses,
called Bridie’s Yard, where there is always excess demand for the
units.
ARCHITECTURE: NORTH LIGHT BUILDINGS
One of the buildings destroyed was the 1952 Hepworth Building, the
first vaulted north light building ever erected in the UK. It was
occupied up until 1995, but was demolished at very short notice on
the grounds that it was “unsafe”; no time was given for objectors
to examine the evidence. Many people in the town assume it was
demolished because it got in the way of the RDA’s traffic scheme.
Besides the Hepworth building, another even larger building known as
the Bauhaus, also demolished, and the red brick building now under
threat are all north light industrial buildings. These are carbon
friendly because they require less daytime lighting, and they are
oriented perfectly for taking solar panels.
CONTAMINATION
The RDA claims that the site is contaminated, yet a report carried
out for the previous owners by EMV Enviroclean in 1994 stated that it
would cost just £12,000 to clean up the site.
VIABILITY OF REFURBISHMENT
A report commissioned by Mendip Council and carried out in 2000 by
Watts and partners estimated the costs of refurbishing eight, out of
the 11 principal buildings at £2,875,000 in total — less than half
the price reputed to have been paid by the RDA for the site, and a
fraction of the £30 million estimated by the RDA as necessary for
total redevelopment of the site.
THE RDA’S AIM
Local people believe that the RDA’s aim is to demolish as much as
possible on the site so that they can offer oven-ready Brownfield
sites to their friends in the development industry. There are also
well-founded rumours that Avalon Plastics, a Glastonbury factory, ha
been invited to relocate onto part of the site, thereby releasing
their old site for the retail development that the town and district
council’s didn’t want — which will result in a loss of
employment land.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.gn.apc.org/mailman/private/diggers350/attachments/20090106/17ba6037/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/x-ygp-stripped
Size: 273 bytes
Desc: not available
URL: <https://mailman.gn.apc.org/mailman/private/diggers350/attachments/20090106/17ba6037/attachment.bin>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/x-ygp-stripped
Size: 271 bytes
Desc: not available
URL: <https://mailman.gn.apc.org/mailman/private/diggers350/attachments/20090106/17ba6037/attachment-0001.bin>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/x-ygp-stripped
Size: 295 bytes
Desc: not available
URL: <https://mailman.gn.apc.org/mailman/private/diggers350/attachments/20090106/17ba6037/attachment-0002.bin>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/x-ygp-stripped
Size: 281 bytes
Desc: not available
URL: <https://mailman.gn.apc.org/mailman/private/diggers350/attachments/20090106/17ba6037/attachment-0003.bin>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/x-ygp-stripped
Size: 277 bytes
Desc: not available
URL: <https://mailman.gn.apc.org/mailman/private/diggers350/attachments/20090106/17ba6037/attachment-0004.bin>
More information about the Diggers350
mailing list